콘텐츠로 건너뛰기

Piping equipment construction

Connecting pipe at the bottom of the water tank

Plumbing welding

Bottom piping of water tank

Water tank top connection

Wastewater treatment pipes

Working on pipes

  • High quality and shortened delivery date by applying skid modularization
  • Realization of high quality and shortened delivery time through spool production
  • Prevents pipe oxidation through N2 purge and TIG welding.
  • Removal of contaminants and prevention of corrosion through acid cleaning
  • Quality improvement through professional work by specialized companies
  • Prevent problems in advance by reviewing important items in advance
  • Quality/delivery response by securing PVDF/PE professional workers. Holds PVDF/PE construction license
  • Can be produced in the same size using a production JIG
  • Securing production quality through dedicated cutting machine and laser processing
  • Accurate construction by applying laser level equipment
  • Efficient on-site construction through system understanding

Wastewater reuse system using hollow fiber membrane

Production of PIPING SPOOL

Acid washing after producing PIPING SPOOL

Nicetech Co., Ltd.
Company Registration Number 312-81-78827 / E-mail : nicetech100@hanmail.net
Factory 1 : 197 Inju-ro, Inju-myeon, Asan-si, Chungcheongnam-do, Korea
Factory 2 / Office : 134 Haeam-ro, Inju-myeon, Asan-si, Chungcheongnam-do, Korea
Construction plant / Tangjeong office building : 392-46, Yi Sunsin-daero, Yeomchi-eup, Asan-si, Chungcheongnam-do, Korea

Plant Division TEL : 041-547-9010 / FAX : 041-547-9011
Energy Division TEL : 041-414-9010 / FAX : 041-414-9012

Copyright ⓒNicetech Co., Ltd. 2023. All rights reserved.